Inferred Resource
180,000 oz Au
4 Mt @ 1.38 g/t — inferred, from surface
Land Package
50,000+ ha
50 km prospective trend — 13 targets, only 3 drilled
Best Intercept
20.5m @ 4.69 g/t Au
FCC002 — Queimadas target
Phase III
5,000m diamond drilling
Fully funded — underway since April 2026
Pedra Branca Inferred Mineral Resource: 4.04 Mt at 1.38 g/t Au, containing 180,000 oz Au (0.40 g/t Au cut-off). Source: Pedra Branca NI 43-101 technical report, effective March 16, 2021; QP Rodrigo Mello, FAusIMM. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Inferred resources cannot be used for economic analysis. This page may contain forward-looking information; actual results may differ materially. See full cautionary statements.